Installation of Central Heating Method statement

Installation of Central Heating Method statement
Product Code: Download
Availability: In Stock
Price:
£8.99
- +
 
   - OR -   

·        Lease with customer to confirm working hours, final position of radiators, discuss isolation of the existing gas and electrical services, and to inform home owner of the potential hazards.

·        Floor boards lifted where required locating drain points, attaching hose pipes and discharge into suitable drain.

·        Isolate water supplies to the existing system.

·        Lay dust sheets and other appropriate protection; remove redundant materials such as radiators, old pipes.

·        Lift carpets if required, floorboards etc and install new pipework, floor joists notched or drilled to take new pipe.

·        Run the new pipework, soldering where required (ensure that fire extinguisher available and that no flammable material near soldering points).

The items above are a portion of the actual method statement sequence of works....